Design & Built of SWCC’s Al Jubail Desalination Plant 2nd Pass RO unit
Scope of work:
- EPC (including basic and detailed design), installation and commissioning of a 2nd pass RO unit with capacity, 83,000 m3/d.
- The purpose of the project was to minimize the Chloride & Boron concentrations for the final water product.
Key challenges:
- Connecting the 2nd pass unit with the 1st pass unit while the plant was operational.
- Inconsistent characteristics of effluent water.
- Complexities in connecting to the Distributed Control system of the existing plant.
Key information:
- Project Duration: 2016 – 2018 Project
Qulwa & Al-Makhwah Dam Water Treatment Plant
- Project Name:Dam Water Treatment Plant
- Capacity: 2 X 20,000 m3/day
- Location: Al Baha, Saudi Arabia
- Purpose: Treat Dam Water Using Ceramic Filters
- Project Duration: 24 Months
- Completion Date: 2024
- Client: National Water Company
Dammam 2nd Industrial City Drinking Water Treatment Plant
- Project Name:Drinking Water Treatment Plant
- Capacity: 15,000 m3/day
- Location: Dammam, Saudi Arabia
- Purpose: Treat Brackish Well Water using Reverse Osmosis Technology
- Project Duration: 24 Months
- Completion Date: 2016
- O&M: 12 Months
- Client: Saudi Industrial Property Authority (Modon)